Work is now complete on our £6.8m Mechanical and Engineering contract at Berkeley St Edwards’ prestigious Royal Warwick Square development, located in the heart of the Royal Borough of Kensington and Chelsea.
The impressive development comprises a collection of impressive one, two and three-bedroom properties with private leisure facilities across six blocks. We’ve just completed the fit-out of Block J, which is made up of 86 dwellings, with a bar area and restaurant, progressing the design from RIBA stage 3 to stage 5.
We delivered essential infrastructure including six plant rooms, a nurse call system, apartment fire suppression systems, home automation system with concierge integration, and a rainwater harvesting system for the site wide irrigation system. We also installed water leak detection within all bathrooms, kitchens, and mechanical cupboards within apartments.
Thanks to our longstanding relationship with Berkeley, we secured a total of six contracts at Royal Warwick Square and have worked on three out of the six blocks – E, H and J.